Form Type

Acceptance Criteria

Purpose

A definition in measurable terms of what must be done for the final product to be acceptable to the Customer and staff who will be affected.

Project Name

 

Project Manager

 

Form Number

 

Date Raised

 

Raised by

 

Target dates

 

Major functions

 

Appearance

 

Personnel level required to use/operate the product

 

Performance levels

 

Capacity

 

Accuracy

 

Availability

 

Reliability (mean/maximum time to repair, mean time between failures)

 

Development cost

 

Running costs

 

Security

 

Ease of use

 

Timings.